Comparison of on-site titration analyses and process control units
The measured quantities in on-site analysis procedures were compared with reporting units in process control tables, and process-specific conversion items were organized.
Plating development, process trials and technical reviews by SUNGJINLOGIS.
19 articles
The measured quantities in on-site analysis procedures were compared with reporting units in process control tables, and process-specific conversion items were organized.
Catalyst test records were grouped into single-shot injection molded, conventional two-shot injection molded and special-geometry specimens to define the scope of coverage and selective plating evaluations.
Same-day and later evaluations of plated PC were separated from results after subsequent plating stages to compare peeling patterns and the metal layers observed.
Thickness measurements on both sides of plated PPS were reanalyzed by lot, distinguishing average thickness, local deviations and adhesion observations.
Inspection records for early- and late-run samples were paired to compare dent occurrence and thickness changes in individual metal layers.
Three post-treatment groups of sulfate-based trivalent chromium-plated parts underwent a 48-hour CASS test. One group passed and two groups failed.
We reapplied post-treatment to stored trivalent chromium-plated parts and observed wetting after rinsing and the presence of white haze.
We compared corrosion after salt spray exposure and appearance under different post-treatments for copper- and nickel-plated PPS.
We compared post-treatment, rinsing, and water removal conditions to reduce staining on finished plated parts.
We compared incomplete coverage and adhesion early and late in production, including observations before and after pretreatment changes.