Research & Technical Library

Process technology

Comparison of catalyst bath composition before and after production and replenishment timing

Overview

Main catalyst bath analyses before and after production were linked with replenishment timing to compare changes in individual components.

Operating records for the main catalyst bath were reviewed to examine changes in bath components during production. In-house analyses taken before and after production on the same working day were paired and compared with chemical replenishment times.

Measured tin concentrations were lower after production on many days, but higher on some dates. Hydrochloric acid concentrations sometimes changed in the opposite direction to tin concentrations.

Samples taken after pre-production replenishment were distinguished from samples taken before replenishment. Changes on days when replenishment occurred during production were also documented separately.

AttachmentComparison of catalyst bath composition before and after production and replenishment timing.docx
Back to list

Notice

You do not have permission to download this file.